ABOUT
PROJECTS
MASH
NEWS
TTI RESEARCHERS
EVENTS
PARTNERS PAGE
Breakaway Devices
Bridge Rail
Cable Barrier
Concrete
Crash Cushion
Guardrail
Transition
Work Zone Devices
Search
Reset
Status
All
Completed Projects (37)
Keyword
Results
Design and Evaluation of MASH TL-5 Concrete Median Barrier with Shallow Embedment (TTI-620331, T1969-AM)
Washington State I-90 Snoqualmie Pass Barrier Gap Full-Scale Crash Testing (Supplemental) (TTI-618141, T4541-EY)
Design and Testing of MASH TL-3 Compliant Anchored F-Shape Portable Concrete Barrier System with Vertical Anchors (Supplemental) (TTI-616811, T4541-EN)
Design and Evaluation of a MASH TL-2 Permanent Low-Profile Barrier (Supplemental) (TTI-616151, T4541-EJ)
MASH TL-4 CRASH TESTING OF BICYCLE RAILING ON A CONSTANT SLOPE PARAPET (TTI-616221, T4541-EH)
Evaluation of MASH TL-3 Transition Design with a Storm Drain – Crash Test of 1100C Vehicle (Small Car) (TTI-619551, T1969-AG)
MASH 4-12 Evaluation of Single Slope Concrete Bridge Rail with Fence System Mounted on Top (TTI-617741, T4541-ES)
A Study of Acceptable Sidewalk Heights and Width (614091/ T4541-DV)
Evaluation of MASH TL-3 Transition Design with a Storm Drain Inlet – Transition Development and Crash Test of 2270 Vehicle (Pickup Truck)(615251/ Task Order DY)
MASH Evaluation of F-Shape and Single-Slope Concrete Barriers with Drainage Scuppers (Supplemental) (Task Order DK/612831)
MASH TL-4 Concrete Median Barrier with Fence Mounted on Top (613131/Task Order DN)
MASH TL-3 Evaluation of Redesigned Barrier Gap Rail (610461/T4541-CZ)
Engineering Support and Recommendations for Roadside Safety Issues/Problems (610811)
Determination of Pedestrian Rail Offset Requirements to Eliminate Vehicle Interaction (611991/Task Order DI)
MASH TL-4 Investigation and Testing of Critical Flare Rate for Cast-In-Place Concrete Barrier Flaring around a Fixed Object (611901/Task Order DG)
MASH Test 3-11 on F-Shape Portable Concrete Barrier Pinned to Concrete(610231/Task Order CY)
MASH Test 4-12 on Keyed-In Single-Slope Barrier with 40-ft Segment Length (610221)
MASH Testing of Free-Standing and Pinned Temporary Concrete Barrier (607911/Task Order CN)
Guidebook to Assist Implementation of Pinned Down Barrier (605071)
Transition Design for Temporary Concrete Barrier Pinned on Asphalt to Rigid Concrete Barrier (605641)
Evaluation of Concrete Traffic Barrier with Acoustic Coating (602191)
Transition for Anchored Temporary Concrete Barrier System in Asphalt Pavement — Phase II (601651)
Temporary Precast Concrete Barrier with Pinning Holes on Both Sides (405160-37)
Transition for Anchored Temporary Concrete Barrier System in Asphalt Pavement (405160-36)
TL-4 Design and Analysis for Sloped Median Wall for Grade Separations (405160-35)
Transition Design for Anchored to Rigid Barrier (405160-34)
Split Single Slope Median Wall For Grade Separations (405106-33)
Rebar Locator for Pinned Precast Barrier Application (405160-32)
WSDOT Pin & Loop Barrier with Drainage Slots- Phase II (405160-30)
Single Slope Half Size Concrete Barrier Wall (405160-27)
Transition Design for Temporary Concrete Barrier (405160-26)
Anchored Temporary Concrete Barrier on Asphalt and Soil (405160-25)
F-Shape Concrete Barrier with Slotted Drain Holes – Phase I (405160-19)
WSDOT Pin & Loop Barrier with Drainage Slots – Phase I (405160-18)
Mechanically Stabilized Earth (MSE) Retaining Walls – Phase I (405160-15)
Concrete Barriers for Slopes or MSE Walls (405160-13)
Anchored Concrete Barrier (405160-3)