Midwest Guardrail System (MGS) to PCB Transition

Report Number(s): TRP-03-335-17

Description: The Midwest Guardrail System (MGS) to PCB Transition (STG05) consists of nested MGS, a stiffness transition, and F-shaped PCB (SWC09) at a 15H:1V flare.

Test Level: 3

Eligibility Letter: B290

System Type: Guardrail to Concrete

MASH Test Number: 3-20, 3-21

Proprietary/Non-proprietary: Non-proprietary

Pass/Fail: Pass

Evaluation: Full-Scale Crash Testing

Sponsor: NEBRASKA DEPARTMENT OF ROADS, SMART WORK ZONE DEPLOYMENT INITIATIVE

Test Article Description

Transition Type: W-Beam

Nested: No

Rubrail: No

Rubrail Nested: No

Height: 31"

Post Material: Steel

Top Rail Blockout Depth: 12"

Curb Present: No

Report(s):

b290

TRP-03-335-17